Software Applications Overview

Loading...
Просмотреть программу курса

Получаемые навыки

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Рецензии

4.8 (оценок: 1,350)
  • 5 stars
    79.55%
  • 4 stars
    18.29%
  • 3 stars
    1.62%
  • 2 stars
    0.29%
  • 1 star
    0.22%
GV

Sep 10, 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF

May 14, 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

Из урока
Technology Applications for Scheduling
Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.

Преподаватели

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Ознакомьтесь с нашим каталогом

Присоединяйтесь бесплатно и получайте персонализированные рекомендации, обновления и предложения.