Probability of Completing a Project: Normal Distribution

video-placeholder
Loading...
Просмотреть программу курса

Получаемые навыки

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Рецензии

4.8 (оценок: 1,540)
  • 5 stars
    79,35 %
  • 4 stars
    18,11 %
  • 3 stars
    2,01 %
  • 2 stars
    0,32 %
  • 1 star
    0,19 %
VT
23 дек. 2019 г.

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF
13 мая 2020 г.

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

Из урока
Program Evaluation & Review Technique (PERT) and Range Estimating

Преподаватели

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Ознакомьтесь с нашим каталогом

Присоединяйтесь бесплатно и получайте персонализированные рекомендации, обновления и предложения.