Lean Design and Lean Scheduling

Loading...
Из курса от партнера Columbia University
Construction Scheduling
742 оценки
Columbia University
742 оценки
Курс 2 из 4 — Specialization Construction Management
Из урока
Lean Design in Construction Scheduling
Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.