Introduction to Activity Precedence Diagrams

Loading...
Просмотреть программу курса

Получаемые навыки

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Рецензии

4.8 (оценок: 848)
  • 5 stars
    677 ratings
  • 4 stars
    155 ratings
  • 3 stars
    11 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

EJ

Apr 20, 2019

I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.

Из урока
Activity Precedence Diagrams
In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.

Преподаватели

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Ознакомьтесь с нашим каталогом

Присоединяйтесь бесплатно и получайте персонализированные рекомендации, обновления и предложения.