Introduction to Activity Precedence Diagrams

Loading...
Просмотреть программу курса

Получаемые навыки

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Рецензии

4.8 (оценок: 1,463)
  • 5 stars
    79.63%
  • 4 stars
    17.97%
  • 3 stars
    1.84%
  • 2 stars
    0.34%
  • 1 star
    0.20%
GV
9 сент. 2020 г.

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF
13 мая 2020 г.

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

Из урока
Activity Precedence Diagrams
In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.

Преподаватели

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Ознакомьтесь с нашим каталогом

Присоединяйтесь бесплатно и получайте персонализированные рекомендации, обновления и предложения.