Insuring a Project Stays on Track

Loading...
Просмотреть программу курса

Получаемые навыки

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Рецензии

4.8 (оценок: 875)
  • 5 stars
    696 ratings
  • 4 stars
    161 ratings
  • 3 stars
    13 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
BA

Mar 16, 2019

It was a very dynamic course which contained many useful knowledge. I gained many important information that will help me a lot.\n\nThanks to Coursera and to my Instructors.

MH

Oct 18, 2019

I have learnt a lot of new Scheduling tools, very happy to complete this course. Thanks a lot Columbia University & respected mentors. Hats off & thumb up.

Из урока
The Role of the Scheduler in Construction Management
Jennifer Buermann, of the STV Group, discusses the role of the scheduler in a construction project and how to determine if a project is on track to meet the estimated goals. Also covered are ways to adjust to ensure the project stays on track.

Преподаватели

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Ознакомьтесь с нашим каталогом

Присоединяйтесь бесплатно и получайте персонализированные рекомендации, обновления и предложения.